Reference
may please be made to SRO. No. 871(I)/2006 dated August
25, 2006, on the captioned subject issued by Ministry
of Commerce in terms of which F.E. Circular No. 14 dated
September 15, 2006 was issued by SBP wherein R&D Support
was made available to leather footwear sector.
In
order to streamline the process/implementation of R &
D Support, following guidelines/decisions, duly approved
by Ministry of Commerce, are issued:-
a.
Period of 90 days would be applicable only for submission
of cases and not for resubmission of cases.
b.
If the H. S. Code is eligible and the basic description
of goods given in invoice/GDF match with the description
of goods in Pakistan Customs Tariff Codes (PCTC), cases
will be entertained.
c.
Claims having H. S. Codes under heading “others”
will be entertained if the ‘E’ Form /Shipping
Bill/Invoice contain the same H. S. Codes.
d.
Combined claims where 2 or more Form “E” are
involved will be accepted.
e.
Differences in dates on MR (on the back of GD Form) and
date of shipment on B/L will be ignored. This difference
is usually due to requirements of L/C. The date on MR
shall be considered for calculating the eligible period.
f.
Commission Paid Certificate will not be required.
g.
Pakistan Footwear Manufacturers Associations (PFMA) will
be responsible for thorough verification of its members’
status. It will ensure proper utilization of R&D Support
by its members. Once the claim duly certified by the PFMA
is submitted to SBP-BSC (Bank) Offices, the same will
be entertained without further authentication/ reference
to PFMA. However, as a precautionary measure, PFMA is
required to furnish a list of its members to SBP and Ministry
of Commerce for information and record. Further, it will
submit a statement giving details of cases certified by
them on monthly basis to the concerned area office of
SBP-BSC (Bank).
h.
Copy of Bill of Lading, Seaway Bill, House Airway Bill
with relevant Carrier Airway Bill and Through Bill of
Lading will be acceptable. However, where date of shipment
is not available on the document, additional evidences
of shipment may be required to determine the eligibility
of claim.
i.
The claims for R&D Support which could not be filed
/ submitted to SBP-BSC Offices within prescribed time
period of 90 days, for any reason, are allowed to be submitted
by June 15, 2007, as a one time extension.
Authorized
Dealers are advised to bring the same to the notice of
all their constituents.